Regulatory Permit Program

Redirecting...

The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey.

 

      
 Water is Gooood!!!!

Regulatory Public Notices

As used by the Corps, the term "public notice" is an official, required government announcement of a proposed agency action, decision made or under consideration, public hearing or other activity.  Please download the attachment(s) associated with notice for the complete, formatted, public notice with tables, illustrations, maps and plans.

Subscribe to District Public Notices: The Wilmington District maintains an email distribution list of the individuals that are interested in receiving email notifications for all public notices issued by Wilmington District Regulatory Offices. Please click here if you would like to subscribe to our email distribution list.

 

Mitigation Public Notices

For all public notices pertaining to compensatory mitigation bank proposals or in-lieu fee mitigation sites developed by the North Carolina Division of Mitigation Services (NCDMS), please go to the Regulatory In-lieu Fee and Bank Information Tracking System website at https://ribits.ops.usace.army.mil/ords/f?p=107:2::::::

To access the public notices, first select the Wilmington District from the Filter View drop-down menu in the lower left-hand corner, and then select the Bank & ILF Establishment tab.

Results:
Tag: NC
Clear
  • SAW-2012-00156

    Expiration date: 10/29/2015

    The Wilmington District, Corps of Engineers (Corps) received an application from North Carolina Department of Transportation, Mr. Richard W. Hancock, P.E., Manager, Project Development and Environmental Analysis Branch, 1548 Mail Service Center, Raleigh, North Carolina 27699-1548 seeking Department of the Army authorization for the permanent impact to 4,162 linear feet of stream channel (of which 225 linear feet is bank stabilization), temporary impact to 309 linear feet of stream channel and the temporary impact to 0.1 acres of wetland. The proposed impacts are associated with the I-77 High Occupancy Toll (HOT) lanes project (TIP #s I5405, I4750AA and I3311C) located along approximately 26 miles of I-77 starting north of NC 150 in Iredell County and continuing south along I-77, deviating from I77 at the I-277 interchange and following I-277 approximately 1.2 miles to terminate at North Brevard Street in Charlotte, Mecklenburg County, North Carolina.

  • SAW-2015-01856

    Expiration date: 10/5/2015

    The Wilmington District, Corps of Engineers (Corps) received an application from North Carolina Department of Transportation, Ferry Division seeking Department of the Army authorization to excavate a 3,350 foot long by 150 foot wide channel to a depth of -12' generating 88,132 cubic yards of spoil material that will be disposed of via side cast dredge, associated with opening a safe navigable channel on the south side of Hatteras Inlet between the north end of Ocracoke Island and the Gorge in Hatteras Inlet in Dare County, North Carolina.

  • SAW-2014-01246

    Expiration date: 9/28/2015

    The Wilmington District, Corps of Engineers (Corps) received an application from Mr. Jack Garvey of Hanson Aggregates Southeast, LLC seeking Department of the Army authorization to mechanically landclear and discharge fill material into 2,523 linear feet of jurisdictional streams and 0.04 acre of jurisdictional wetlands, associated with the Crabtree Quarry Expansion, in Raleigh, in Wake County, North Carolina.

  • SAW-2011-01914

    Expiration date: 10/13/2015

    The Wilmington District, Corps of Engineers (Corps) received an application from the Town of Holden Beach (Town) seeking Department of the Army authorization to discharge fill material into waters of the United States, associated with the construction of a 700-ft-long terminal groin with a 300-ft shore anchorage system and associated longterm beach nourishment component, in order to address erosion and protect infrastructure, roads, homes, beaches, dunes and wildlife habitat in Holden Beach, Brunswick County, North Carolina. Specific plans and location information are described below and shown on the attached plans.

  • SAW-2013-00556

    Expiration date: 9/4/2015

    The Wilmington District, Corps of Engineers (Corps) received an application from TDO Land Holdings, LLC seeking Department of the Army authorization to discharge fill material into waters of the United States, associated with constructing access and infrastructure for phase II of the Triad Business Park (TBP) development in Guilford County, North Carolina.