As used by the Corps, the term "public notice" is an official, required government announcement of a proposed agency action, decision made or under consideration, public hearing or other activity.  Please download the attachment(s) associated with notice for the complete, formatted, public notice with tables, illustrations, maps and plans.

Subscribe to District Public Notices: The Wilmington District maintains an email distribution list of the individuals that are interested in receiving email notifications for all public notices issued by Wilmington District Regulatory Offices. Please click here if you would like to subscribe to our email distribution list.

 

Mitigation Public Notices

For all public notices pertaining to compensatory mitigation bank proposals or in-lieu fee mitigation sites developed by the North Carolina Division of Mitigation Services (NCDMS), please go to the Regulatory In-lieu Fee and Bank Information Tracking System website at https://ribits.ops.usace.army.mil/ords/f?p=107:2::::::

To access the public notices, first select the Wilmington District from the Filter View drop-down menu in the lower left-hand corner, and then select the Bank & ILF Establishment tab.

Results:
Tag: North Topsail Beach
Clear
  • SAW-2014-02012

    Expiration date: 7/29/2015

    The Wilmington District, Corps of Engineers (Corps) received an application from Mr. Jeffrey Hudson of Onslow County seeking Department of the Army authorization to perform maintenance dredging in the Atlantic Intracoastal Waterway (AIWW), New River Inlet, and Cedar Bush Cut and deposit dredged material along the northern 2 miles of the North Topsail Beach oceanfront associated with an Onslow County Navigation Project in the Town of North Topsail Beach, Onslow County, North Carolina.

  • SAW-2005-00344

    Expiration date: 2/28/2014

    All interested parties are hereby advised that the Wilmington District, Corps of Engineers (Corps) is extending the January 10, 2014 Public Notice commenting period for the Town of North Topsail Beach’s request to modify the May 27, 2011 Department of the Army to relocate the New River Inlet ebb tide channel and to conduct beach nourishment along 11.1 miles of North Topsail Beach oceanfront shoreline in Onslow County, North Carolina. The proposed modification request is to combine Phase 3 and 5 sections into a single dredging event. All plans described in the January 10, 2014 Public Notice remain the same with the exception that the Town proposes to extend their dredging window from November 16th - March 31st to November 16th to April 30th. This proposed window extension is to ensure that Phase 3 and Phase 5 can be completed during one dredging cycle. This notice amends our January 10, 2014 Public Notice seeking comments on the modification project and extends the commenting period to February 28, 2014.

  • SAW-2005-00344

    Expiration date: 2/11/2014

    The Wilmington District, Corps of Engineers (Corps) received a request from the Town of North Topsail Beach seeking a permit modification to their current Department of the Army (DA) authorization issued on May 27, 2011 to relocate the New River Inlet ebb tide channel and to conduct beach nourishment along 11.1 miles of North Topsail Beach oceanfront shoreline in Onslow County, North Carolina. The modification request consists of combining Phase 3 to the DA permit modification issued on September 26, 2013, which rescheduled the construction timeframe and implementation of Phase 5. The proposal is to construct Phase 3 and Phase 5 during a single event.

  • SAW-2005-00344

    Expiration date: 9/12/2013

    The Wilmington District, Corps of Engineers (Corps) received a request from the Town of North Topsail Beach seeking a permit modification to their current Department of the Army (DA) authorization issued on May 27, 2011 to relocate the New River Inlet ebb tide channel and to conduct beach nourishment along 11.1 miles of North Topsail Beach oceanfront shoreline in Onslow County, North Carolina. The modification request consists of changing Phase V’s original permitted construction schedule and beach fill footprint.

  • SAW-2005-00344

    Expiration date: 7/22/2013

    All interested parties are herby advised that the Wilmington District, Corps of Engineers (Corps)has published a Notice of Intent (NOI) in the Federal Register to prepare a Draft Supplement of the December 2009 Final Environmental Impact Statement (FEIS) for the Town of North Topsail Beach’s project to relocate the New River Inlet ebb tide channel and to place dredge material along 11.1 miles of ocean shoreline of North Topsail Beach in Onslow County, North Carolina. The main purpose of the project is to provide short and long-term protection of the Town’s infrastructure. The Draft Supplement will address the Town’s proposed modification to consolidate Phases II-V of the original plan into one phase (in a single dredging event), to utilize a hopper dredge, to increase the beach fill density in the original Phase V footprint, to include an additional borrow source, and to extend their dredging activity outside the permitted dredging window.