Public Notice

SAW-2011-02228

Published March 1, 2018
Expiration date: 4/2/2018

 

PUBLIC NOTICE

US Army Corps Of Engineers

Wilmington District

Issue Date: March 1, 2018

Comment Deadline: April 2, 2018

Corps Action ID Number: SAW-2011-02228

The Wilmington District, Corps of Engineers (Corps) received an application from the Military Ocean Terminal Sunny Point (MOTSU) seeking Department of the Army authorization to conduct routine transport and disposal of dredged material to the Wilmington Ocean Dredged Material Disposal Site (ODMDS) located approximately 7 to 12.5 miles south of Bald Head Island in the Atlantic Ocean. This request is associated with maintenance dredging of the existing access channels, connecting channels, and basins at their navigation and loading facilities in the MOTSU harbor in Brunswick County, North Carolina.

Specific plans and location information are described below and shown on the attached plans. This Public Notice and all attached plans are also available on the Wilmington District Web Site at: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx

Applicant: Military Traffic Management Command

Attn: Matthew Swanson

Military Ocean Terminal

Sunny Point (MOTSU)

Southport, North Carolina, 28461

Authority

The Corps evaluates this application and decides whether to issue, conditionally issue, or deny the proposed transport work pursuant to applicable procedures of the following Statutory Authorities:

Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413) Version 6.15.2017 Page 2 

Location

Location Description: The project site, Military Ocean Terminal Sunny Point (MOTSU), is a military ocean terminal located in Brunswick County, North Carolina, on the west bank of the Cape Fear River, approximately 10 miles upstream from the river's mouth. The dredged material will be disposed of at the Wilmington Ocean Dredged Material Disposal site (ODMDS) located approximately seven to twelve miles south of Bald Head Island in the Atlantic Ocean.

Project Area (square nautical miles): 9.4

Nearest Town: Southport, NC

Nearest Waterway: Atlantic Ocean

River Basin: Cape Fear HUC: 03030005

Latitude and Longitude: 33.804360N, -78.048875W

Existing Site Conditions

Plans and construction sequences submitted with application show that the work proposed for this public notice will solely involve the transport of dredged material and placement within the Wilmington ODMDS. The maintenance dredging of existing access channels, connecting channels, and basins at the MOTSU wharves are authorized under separate authority and were originally authorized under Department of the Army (DA) permit Action ID Number SAW-1995-02844, and as modified under Action ID Number SAW-1998-00432. The deepening authorized by the original permit is complete, and the original permit expired on December 31, 2000. The Action ID for the ongoing transportation of the dredged material to the Wilmington ODMDS is SAW-2011-02228.

Prior to disposal at an approved ocean dredged material disposal site, any sediments dredged under DA authorization must be evaluated pursuant to 40 CFR 220-228. This evaluation and concurrence with disposal criteria was previously requested of the United States Environmental Protection Agency (USEPA). By letter dated February 7, 2018 the USEPA provided written concurrence. The concurrence is valid for three years from February 7, 2018. As described in the Section 103 Sediment Evaluation document provided the USEPA, the material transported and disposed consists predominantly of silt and clay. All MOTSU dredged material has undergone Tier III analysis, per USEPA recommendations found in the Southeast Regional Implementation Manual (SERIM). The other projects to utilize the Wilmington ODMDS are the Wilmington Harbor Navigation projects. The Wilmington Harbor projects must also be subject to the same evaluations and concurrence by USEPA. The Wilmington ODMDS Site Management and Monitoring Plan (SMMP) addresses disposal locations per project under the Methods of Disposal section as follows:

To manage site use, maximize site capacity, reduce multiple user conflicts, simplify monitoring and management, and reduce potential adverse impacts to the marine environment, the Wilmington District, USACE in consultation with EPA

Region 4, will designate zones within the ODMDS for dredged materials from each specific ocean dumping activity.

Maintenance dredging projects have been performed in MOTSU on an annual basis, and each dredging project is required to have disposal monitoring according to the latest New Wilmington ODMDS Site Management and Monitoring Plan (SMMP). Typically, automated disposal verification system data are provided electronically to USEPA during dredging operations. For example, a Post Disposal Monitoring Report will list the volume of material disposed of in the ODMDS, the method of dredging, the start and finish dates of dredging operations, and a map of each deposit location within the ODMDS. Therefore, any violations of SMMP conditions are recorded and reported to EPA in accordance with project-specific requirements

Applicant’s Stated Purpose

The applicant states: "Annual dredging in the MOTSU harbor and shipping channels is necessary to maintain safe and adequate depth for vessels served at the terminal. Disposal of the dredged material will occur in the Wilmington Ocean Dredged Material Disposal Site (ODMDS)". Previous applications have stated that the purpose of the work is to enable MOTSU to meet its mission requirements as a unique military port facility designed and constructed specifically for the safe, efficient trans-shipment of explosives, munitions, ordinance, and related material. While adjacent to and dependent on the Wilmington Harbor federal navigation channel project, MOTSU is a separately permitted Military Traffic Management Command facility. Annual dredging is necessary to maintain safe and adequate depth for vessels served by MOTSU.

Project Description

The proposed project is to transport dredged material that is excavated by mechanical means (bucket to barge/clamshell) from the terminals at MOTSU and deposited within the USEPA Section 102 designated Wilmington Ocean Dredged Material Disposal Site (ODMDS). The USEPA concurrence allows for use of clamshell, hydraulic, or hopper dredging, however the transportation of dredged material to the Wilmington ODMDS has historically precluded the use of any other methodology than bucket to barge (clamshell/mechanical). The Wilmington ODMDS is located approximately 7 to 12.5 miles south of Bald Head Island in the Atlantic Ocean. The site was designated by EPA on 5 July 2002 (F.R. Vol 67 No. 129), effective 5 August 2002. The boundary coordinates (NAD 83 Geographic) for the Wilmington ODMDS are:

330 46.0" N 780 02.5" W

330 46.0" N 780 01.0" W

330 41.0" N 780 01.0" W

330 41.0" N 780 04.0" W

The site is located approximately 7 to 12.5 nautical miles offshore Bald Head Island, North Carolina. The Wilmington ODMDS has an area of about 9.4 square nautical miles (nmi2). Depths within the ODMDS range from about -35 to -52 feet local mean low water (m.l.l.w.).

The Wilmington ODMDS has received dredged material from the Wilmington Harbor federal navigation channel and MOTSU approximately every year since the site designation. Disposal will take place in accordance with the current Wilmington Ocean Dredged Material Disposal Site Monitoring and Management Plan. MOTSU proposes to transport approximately 1,000,000 cubic yards of dredged material per year to the Wilmington ODMDS.

Avoidance and Minimization

The applicant provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The sediments proposed for transportation and disposal have been evaluated pursuant to Section 103 of the Marine Protection Research and Sanctuaries Act (MPRSA) and determined to be acceptable for ocean disposal. By letter dated February 7, 2018 the USEPA provided written concurrence. The concurrence is valid for three years from February 7, 2018. MOTSU will continue to abide by all previously authorized permit conditions. Additionally, the applicant has provided information stating that the bucket to barge methodology is compliant with all current environmental requirements and that the scows will be pulled by ocean-going tugboats with an average outbound speed of 4.5 knots and average return speed of 7 knots (below current vessel speed restrictions for reducing ship strikes to North Atlantic right whales).

Compensatory Mitigation

The applicant offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: N/A.

Essential Fish Habitat

Pursuant to the Magnuson-Stevens Fishery Conservation and Management Act, this Public Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The Corps’ initial determination is that the proposed project would not effect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service.

Cultural Resources

Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that:

Should historic properties, or properties eligible for inclusion in the National Register, be present within the Corps’ permit area; the proposed activity requiring the DA permit (the undertaking) is a type of activity that will have no potential to cause an effect to an historic properties. Version 6.15.2017 Page 6

 

The District Engineer’s final eligibility and effect determination will be based upon coordination with the SHPO and/or THPO, as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the Corps-indentified permit area.

Endangered Species

Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information:

The Corps determines that the proposed project may affect, not likely to adversely affect federally listed endangered or threatened species or their formally designated critical habitat. Consultation has been completed for this type of activity and the effects of the proposed activity have been evaluated and/or authorized by the National Marine Fisheries Service (NMFS) in the South Atlantic Regional Biological Opinion or its associated documents, including 7(a)(2) & 7(d) analyses and Critical Habitat assessments. A copy of this public notice will be sent to the NMFS. 

Other Required Authorizations

The Corps forwards this notice and all applicable application materials to the appropriate State agencies for review.

North Carolina Division of Water Resources (NCDWR): The Corps will generally not make a final permit decision until the NCDWR issues, denies, or waives the state Certification as required by Section 401 of the Clean Water Act (PL 92-500). The receipt of the application and this public notice, combined with the appropriate application fee, at the NCDWR Central Office in Raleigh constitutes initial receipt of an application for a 401 Certification. A waiver will be deemed to occur if the NCDWR fails to act on this request for certification within sixty days of receipt of a complete application. Additional information regarding the 401 Certification may be reviewed at the NCDWR Central Office, 401 and Buffer Permitting Unit, 512 North Salisbury Street, Raleigh, North Carolina 27604-2260. All persons desiring to make comments regarding the application for a 401 Certification should do so, in writing, to:

NCDWR Central Office

Attention: Ms. Karen Higgins, 401 and Buffer Permitting Unit

(USPS mailing address): 1617 Mail Service Center, Raleigh, NC 27699-1617 Version 6.15.2017 Page 8

Or,

(physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604

North Carolina Division of Coastal Management (NCDCM):

The application did not include a certification that the proposed work complies with and would be conducted in a manner that is consistent with the approved North Carolina Coastal Zone Management Program. Pursuant to 33 CFR 325.2 (b)(2) the Corps cannot issue a Department of Army (DA) permit for the proposed work until the applicant submits such a certification to the Corps and the NCDCM, and the NCDCM notifies the Corps that it concurs with the applicant’s consistency certification. As the application did not include the consistency certification, the Corps requests, via this Public Notice concurrence or objection from the NCDCM.

Evaluation

The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values (in accordance with Executive Order 11988), land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the discharge of dredged or fill materials in waters of the United States, the evaluation of the impact of the activity on the public interest will include application of the Environmental Protection Agency’s 404(b)(1) guidelines.

Commenting Information

The Corps of Engineers is soliciting comments from the public; Federal, State and local agencies and officials, including any consolidated State Viewpoint or written position of the Governor; Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing will be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing.

The Corps of Engineers, Wilmington District will receive written comments pertinent to the proposed work, as outlined above, until 5pm, April 2, 2018. Comments should be submitted to Mr. Tyler Crumbley, Wilmington Regulatory Field Office, 69 Darlington Avenue, Wilmington, North Carolina 28403 , at (910) 251-4170.