Heavy equipment operators place riprap stone at Duke Energy’s Dan River Power Plant. The stone is being placed in the interior of the coal ash retention pond to create a stable foundation to move heavy equipment in place to reach and seal the broken pipe. The broken pipe will have concrete grout placed inside to form a plug and prevent additional coal ash from escaping. (USACE photo by Ben Lackey)