Little River Reservoir Project

Corps Action ID #: SAW-2004-9984752

Page last updated 12/15/2009.

This page will contain links to environmental documents and notices provided to the Corps related to the proposed project to build the Little River Reservoir.  The City of Raleigh proposes to construct a drinking water reservoir on Little River to satisfy the future demands for the service area which includes Raleigh, Garner, Knightdale, Rolesville, Wake Forest, Wendell, and Zebulon, NC. The proposed project would require the construction of a dam north of U.S. Highway 64 on Little River, a tributary in the Neuse River Basin. In addition, infrastructure improvements including a water treatment plant, water lines, and raising and/or closing existing roadways are expected.  The proposed reservoir will impact approximately 650 acres of wetlands and 55,500 linear feet of stream channel.

(documents are in PDF format)

Project Meetings

Project review meetings are held to facilitate discussion and comment between state and federal agencies and members of the public, the applicant and the Corps, on specific topics that must be addressed as part of the permit application, analysis and review process.

Meeting 6 - October 13, 2009, Topic: Water Treatment Plant Site, Detailed Analysis - Agenda  -  Presentation
Attendance List  - Comments - Meeting Summary - Population and Demand Projection (TM v8 2008_04_28)

Meeting 5 - September 15, 2009, Topic:  Detailed List of Alternatives - Agenda  -  Presentation
Attendance List  added later:  EPA Comments - Meeting Summary - Meeting Comments

Meeting 4 - July 14, 2009, Topic:  Water Treatment Plant Site Selection - Summary  -  Agenda  -  Presentation - Comments  -  Attendance List   -  Technical Memo July 14 final

Meeting 3 - June 9, 2009, Topic:  Existing Environment - Summary  -  Agenda  -  Presentation - Comments  -  Attendance List  

Meeting 2 - May 12, 2009, Topic:  Preliminary List of Alternatives - Summary  -  Agenda  -  Presentation - Comments  -  Attendance List 

 

Meeting 1 - April 14, 2009, Topic:  Project Purpose and Need - Summary  -  Agenda  -  Presentation - Comments  -  Attendance List  -  Draft Plan of Study  -  US Fish and Wildlife LRR Natural Resource Values References

Notice of Intent To Prepare a Draft Environmental Impact Statement for the City of Raleigh, Little River Reservoir Project in Wake County, NC, as published in the Federal Register dated September 5, 2008.

Scoping Meetings - On July 25, 2008, the Corps of Engineers held a scoping meeting to discuss this proposal and to receive comments and concerns from local, state, and federal agencies. In addition, a separate scoping meeting was held for the public on October 14, 2008, at the East Wake High School. The following document summarizes the verbal comments received from these two meetings:  Public Notice - Summary of Scoping Meeting Comments

Related documents & notices:

Prospectus for the City of Raleigh (City) Umbrella Mitigation Bank (Bank), proposed as a vehicle to provide mitigation for unavoidable impacts to streams, wetlands, or Neuse River riparian buffers resulting from the City’s construction of the proposed Little River Reservoir, or other City or third-party projects in the Bank’s geographic service area (GSA), which is the Neuse River watershed.

July 10, 2009 Public Notice: Draft Mitigation Plan for Proctor Farm Mitigation Site, proposed for inclusion in City of Raleigh Umbrella Mitigation Bank

Draft Mitigation Plan - Tarpleys Mill Mitigation Site - stream and wetland mitigation proximate to the proposed Little River reservoir.  Public Notice June 22, 2009.

Draft Mitigation Plan - Vick Property Mitigation Site (Public Notice) - proposed stream, wetland, buffer and conservation areas proximate to proposed Little River Reservoir.

Approved Jurisdictional Determination Form, August 19, 2008

 

Questions?  Contact the Corps Project Manager:  Monte Matthews