Regulatory Permit Program

Redirecting...

The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey.

 

      
 Water is Gooood!!!!

Regulatory Public Notices

As used by the Corps, the term "public notice" is an official, required government announcement of a proposed agency action, decision made or under consideration, public hearing or other activity.  Please download the attachment(s) associated with notice for the complete, formatted, public notice with tables, illustrations, maps and plans.

Subscribe to District Public Notices: The Wilmington District maintains an email distribution list of the individuals that are interested in receiving email notifications for all public notices issued by Wilmington District Regulatory Offices. Please click here if you would like to subscribe to our email distribution list.

 

Mitigation Public Notices

For all public notices pertaining to compensatory mitigation bank proposals or in-lieu fee mitigation sites developed by the North Carolina Division of Mitigation Services (NCDMS), please go to the Regulatory In-lieu Fee and Bank Information Tracking System website at https://ribits.ops.usace.army.mil/ords/f?p=107:2::::::

To access the public notices, first select the Wilmington District from the Filter View drop-down menu in the lower left-hand corner, and then select the Bank & ILF Establishment tab.

SAW-2013-01656

Published July 17, 2014
Expiration date: 8/18/2014

PUBLIC NOTICE
Issue Date: July 17, 2014
Comment Deadline: August 18, 2014
Corps Action ID Number: SAW-2013-01656

The Wilmington District, Corps of Engineers (Corps) received an application from Ms. Elizabeth Letendre seeking Department of the Army authorization to fill or otherwise impact 0.174 acres of jurisdictional wetlands, associated with development of a venue for weddings in Currituck County, North Carolina.
Specific plans and location information are described below and shown on the attached plans. This Public Notice and all attached plans are also available on the Wilmington District Web Site at: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx

Applicant: Ms. Elizabeth Letendre
46 Eden Road
Rockport, Massachusetts 01966
AGENT (if applicable): Mr. George Wood
Environmental Professionals, Inc.
Post Office Box 3368
Kill Devil Hills, North Carolina 27948

Authority
The Corps evaluates this application and decides whether to issue, conditionally issue, or deny the proposed work pursuant to applicable procedures of the following Statutory Authorities:
Section 404 of the Clean Water Act (33 U.S.C. 1344)
Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)
Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413)
Location
Directions to Site: From the intersection of US 158 and NC 12 in the town of Kitty Hawk, North Carolina, turn north and follow NC 12 for 21 miles to the North Beach
Access in Corolla, North Carolina. Travel 1.87 miles north on the four wheel drive section of NC 12 to 1441 Ocean Pearl Road. The property is west of the primary dune adjacent to the Atlantic Ocean.
Project Area (acres): 3.67 Nearest Town: Corolla, North Carolina
Nearest Waterway: Atlantic Ocean River Basin: Pasquotank
Latitude and Longitude: 36.4224N, -75.8376W

Existing Site Conditions
The current site conditions consist of an undeveloped parcel with 3.58 acres of uplands and 0.86 acres of jurisdictional wetlands within the four-wheel drive section of Corolla, North Carolina. The parcel has been delineated by the US Army Corps of Engineers (Corps) and jurisdictional wetlands identified as Basin Wetlands were identified on the property. Adjacent properties consist of residential and rental cottages typically used for vacationing and tourism on the Outer Banks.

Applicant’s Stated Purpose
The applicant’s purpose is to establish a wedding venue in the off-road section of the Outer Banks of Currituck County in North Carolina.

Project Description
The proposed project involves the construction of four buildings, a swimming pool/spa, dune walkway, a drive with 24 parking spaces and a pre-treatment system that will accommodate 24 bedrooms. Three of the structures will be elevated on piling a minimum of five feet above ground level.

Avoidance and Minimization
The applicant provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The proposed project will take place on a parcel that is 1095 linear feet long by 146 linear feet wide. The majority of the uplands are located on the eastern portion of the property adjacent to the Atlantic Ocean. By situating the project area on the east end of the parcel the applicant will avoid 0.686 acres of the 0.86 acres of jurisdictional wetlands on the property. The Basin Wetlands within the project area run from north to south and completely bisect the property. The project design will result in the shading of 0.133 acres of jurisdictional wetlands and the filling of 0.041 acres jurisdictional wetlands.

Compensatory Mitigation
The applicant offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The applicant has proposed to purchase wetland credits within the Pasquotank HUC (03010205) for compensation of unavoidable impacts.

Essential Fish Habitat
Pursuant to the Magnuson-Stevens Fishery Conservation and Management Act, this Public Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The Corps’ initial determination is that the proposed project may affect, but not likely to adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service.

Cultural Resources
Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that:
Should historic properties, or properties eligible for inclusion in the National Register, be present within the Corps’ permit area; the proposed activity requiring the DA permit (the undertaking) is a type of activity that will have no potential to cause an effect to an historic properties.
No historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps’ permit area; therefore, there will be no historic properties affected. The Corps subsequently requests concurrence from the SHPO (or THPO).
Properties ineligible for inclusion in the National Register are present within the Corps’ permit area; there will be no historic properties affected by the proposed work. The Corps subsequently requests concurrence from the SHPO (or THPO).
Historic properties, or properties eligible for inclusion in the National Register, are present within the Corps’ permit area; however, the undertaking will have no adverse effect on these historic properties. The Corps subsequently requests concurrence from the SHPO (or THPO).
Historic properties, or properties eligible for inclusion in the National Register, are present within the Corps’ permit area; moreover, the undertaking may have an adverse effect on these historic properties. The Corps subsequently initiates consultation with the SHPO (or THPO).
The proposed work takes place in an area known to have the potential for the presence of prehistoric and historic cultural resources; however, the area has not been formally surveyed for the presence of cultural resources. No sites eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work. Additional work may be necessary to identify and assess any historic or prehistoric resources that may be present.
The District Engineer’s final eligibility and effect determination will be based upon coordination with the SHPO and/or THPO, as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the Corps-indentified permit area.

Endangered Species
Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information:
The Corps determines that the proposed project would not affect federally listed endangered or threatened species or their formally designated critical habitat.
The Corps determines that the proposed project may affect federally listed endangered or threatened species or their formally designated critical habitat. The Corps initiates consultation under Section 7 of the ESA and will not make a permit decision until the consultation process is complete.
The Corps is not aware of the presence of species listed as threatened or endangered or their critical habitat formally designated pursuant to the Endangered Species Act of 1973 (ESA) within the project area. The Corps will make a final determination on the effects of the proposed project upon additional review of the project and completion of any necessary biological assessment and/or consultation with the U.S. Fish and Wildlife Service and/or National Marine Fisheries Service.

Other Required Authorizations
The Corps forwards this notice and all applicable application materials to the appropriate State agencies for review.
North Carolina Division of Water Resources (NCDWR): The Corps will generally not make a final permit decision until the NCDWR issues, denies, or waives the state Certification as required by Section 401 of the Clean Water Act (PL 92-500). The receipt of the application and this public notice, combined with the appropriate application fee, at the NCDWR Central Office in Raleigh constitutes initial receipt of an application for a 401 Certification. A waiver will be deemed to occur if the NCDWR fails to act on this request for certification within sixty days of receipt of a complete application. Additional information regarding the 401 Certification may be reviewed at the NCDWR Central Office, 401 and Buffer Permitting Unit, 512 North Salisbury Street, Raleigh, North Carolina 27604-2260. All persons desiring to make comments regarding the application for a 401 Certification should do so, in writing, by August 18, 2014 to:
NCDWR Central Office
Attention: Ms. Karen Higgins, 401 and Buffer Permitting Unit
(USPS mailing address): 1650 Mail Service Center, Raleigh, NC 27699-1650
Or,
(physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604
North Carolina Division of Coastal Management (NCDCM):
The application included a certification that the proposed work complies with and would be conducted in a manner that is consistent with the approved North Carolina Coastal Zone Management Program. Pursuant to 33 CFR 325.2 (b)(2) the Corps cannot issue a Department of Army (DA) permit for the proposed work until the applicant submits such a certification to the Corps and the NCDCM, and the NCDCM notifies the Corps that it concurs with the applicant’s consistency certification. As the application included the consistency certification, the Corps requests, via this Public Notice, concurrence or objection from the NCDCM.
Based upon all available information, the Corps determines that this application for a Department of Army (DA) permit does not involve an activity which would affect the coastal zone, which is defined by the Coastal Zone Management (CZM) Act (16 U.S.C. § 1453).
Evaluation
The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values (in accordance with Executive Order 11988), land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the discharge of dredged or fill materials in waters of the United States, the evaluation of the impact of the activity on the public interest will include application of the Environmental Protection Agency’s 404(b)(1) guidelines.

Commenting Information
The Corps of Engineers is soliciting comments from the public; Federal, State and local agencies and officials, including any consolidated State Viewpoint or written position of the Governor; Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing shall be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing.
The Corps of Engineers, Wilmington District will receive written comments pertinent to the proposed work, as outlined above, until 5pm, August 18, 2014. Comments should be submitted to Mr. Kyle Barnes, Washington Regulatory Field Office, 2407 West Fifth Street , Washington, North Carolina 27889, at (910) 251-4584.