Regulatory Permit Program

Redirecting...

The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey.

 

      
 Water is Gooood!!!!

Regulatory Public Notices

As used by the Corps, the term "public notice" is an official, required government announcement of a proposed agency action, decision made or under consideration, public hearing or other activity.  Please download the attachment(s) associated with notice for the complete, formatted, public notice with tables, illustrations, maps and plans.

Subscribe to District Public Notices: The Wilmington District maintains an email distribution list of the individuals that are interested in receiving email notifications for all public notices issued by Wilmington District Regulatory Offices. Please click here if you would like to subscribe to our email distribution list.

 

Mitigation Public Notices

For all public notices pertaining to compensatory mitigation bank proposals or in-lieu fee mitigation sites developed by the North Carolina Division of Mitigation Services (NCDMS), please go to the Regulatory In-lieu Fee and Bank Information Tracking System website at https://ribits.ops.usace.army.mil/ords/f?p=107:2::::::

To access the public notices, first select the Wilmington District from the Filter View drop-down menu in the lower left-hand corner, and then select the Bank & ILF Establishment tab.

Results:
Archive: 2014
Clear
  • SAW-2013-01412

    Expiration date: 3/21/2014

    The Wilmington District, Corps of Engineers (Corps) received an application from Swansboro Investors, LLC seeking Department of the Army authorization to permanently discharge dredged or fill material into 0.86 acre of waters of the U.S., associated with the construction of a big-box store along NC Highway 24 in Swansboro, Onslow County, North Carolina.

  • SAW-2008-03183

    Expiration date: 3/14/2014

    The Wilmington District, Corps of Engineers (Corps) has received an application from the North Carolina Department of Transportation (NCDOT) seeking Department of the Army authorization to permanently impact 9,800 linear feet of jurisdictional stream channel, an additional 1,553 linear feet of temporary stream channel impact, permanently impact 1.96 acres of jurisdictional wetlands, and 4.36 acres of open water impact (ponds), associated with the proposed construction of the Winston-Salem Northern Beltway Eastern Section from US 158 to 1-40 Bus/US 421 (Section B for a total of 3.4 miles), east of Winston-Salem, in Forsyth County, North Carolina. The NCDOT has identified this project as TIP U-2579B.

  • SAW-2005-00344

    Expiration date: 2/28/2014

    All interested parties are hereby advised that the Wilmington District, Corps of Engineers (Corps) is extending the January 10, 2014 Public Notice commenting period for the Town of North Topsail Beach’s request to modify the May 27, 2011 Department of the Army to relocate the New River Inlet ebb tide channel and to conduct beach nourishment along 11.1 miles of North Topsail Beach oceanfront shoreline in Onslow County, North Carolina. The proposed modification request is to combine Phase 3 and 5 sections into a single dredging event. All plans described in the January 10, 2014 Public Notice remain the same with the exception that the Town proposes to extend their dredging window from November 16th - March 31st to November 16th to April 30th. This proposed window extension is to ensure that Phase 3 and Phase 5 can be completed during one dredging cycle. This notice amends our January 10, 2014 Public Notice seeking comments on the modification project and extends the commenting period to February 28, 2014.

  • SAW-2011-01930

    Expiration date: 2/18/2014

    AFFP, LLC notified the Corps of their intentions to modify the previously approved Mitigation Banking Instrument (MBI) for the Anderson Farm Stream Mitigation Bank (Bank). This mitigation bank site is located in Buncombe County, North Carolina with the Upper French Broad (HUC 06010105) as its geographic service area.

  • SAW-2005-00344

    Expiration date: 2/11/2014

    The Wilmington District, Corps of Engineers (Corps) received a request from the Town of North Topsail Beach seeking a permit modification to their current Department of the Army (DA) authorization issued on May 27, 2011 to relocate the New River Inlet ebb tide channel and to conduct beach nourishment along 11.1 miles of North Topsail Beach oceanfront shoreline in Onslow County, North Carolina. The modification request consists of combining Phase 3 to the DA permit modification issued on September 26, 2013, which rescheduled the construction timeframe and implementation of Phase 5. The proposal is to construct Phase 3 and Phase 5 during a single event.